Blog

  1. 2026-10-26

    How to read shadow length to confirm roof collapse in satellite imagery

    How to measure shadow length and sun angle across before/after VHR imagery to confirm roof collapse ahead of a re-strike call.

  2. 2026-10-26

    Strike package definition: what sets the order a re-strike tasking runs in

    A strike package sets the original plan. Here's what determines the order the re-strike tasking runs in once the strike is flown.

  3. 2026-10-19

    Field notes: the six hours between the strike and the pass that mattered

    A field-notes look at the wait between weapons-away and the first usable BDA pass, and why that gap decides the re-strike call.

  4. 2026-10-19

    Weaponeering vs. battle damage assessment: where the two split

    Weaponeering predicts strike effects before the fact. BDA grades what happened after the fact. Here's where the two diverge at the planning table.

  5. 2026-10-14

    CDE vs BDA: what's the actual difference

    CDE and BDA get used interchangeably, but one predicts harm before a strike and the other grades effect after it. Here's the actual difference.

  6. 2026-10-14

    DMPI explained: why the aimpoint decides your re-strike call

    What a desired mean point of impact is, how it differs from the target as a whole, and why re-strike decisions live or die on it.

  7. 2026-10-13

    Confirmed, probable, or possible: how BDA confidence calls actually work

    Why a damage assessment gets labeled confirmed, probable, or possible, and what each tier should (and shouldn't) drive on a re-strike decision.

  8. 2026-10-13

    How to tell a decoy from a destroyed target in satellite imagery

    How to separate a real post-strike kill from a decoy or staged damage in VHR optical imagery, using shadow, debris, and repeat-pass tells.

  9. 2026-10-07

    How long after a strike until imagery is usable?

    What controls imagery turnaround time after a strike: satellite revisit, cloud cover, and tasking priority, and how it shapes a re-strike call.

  10. 2026-10-07

    Mission kill vs catastrophic kill: what the imagery can and can't tell you

    A field guide to mission kill and catastrophic kill definitions, and the hard limits of what before/after optical imagery proves.

  11. 2026-10-07

    MEA vs BDA: what each one tells a planning cell

    BDA grades one target after one strike. MEA tracks munition performance across many. How the two feed each other and which one a re-strike call needs.

  12. 2026-10-07

    Physical vs functional damage assessment: phase 1 and phase 2 explained

    Phase 1 structural grading vs phase 2 functional assessment in BDA, and why conflating them weakens the re-strike call.

← Back to Battle Damage Assessment